Changing the Way We Build

lean advantage

We utilize a number of Lean inspired tools throughout the lifecycle of a project. Embracing technology enables us to eliminate waste and inefficiencies, thus maximizing value for our clients. This graphic below illustrates how our technology tools are used through the Lean building process.

THE TOOLS

LAST PLANNER
SYSTEM
LAST PLANNER SYSTEM
BUILDING INFORMATION MODELING
PROCORE
3D SURVEYING AND
DIGITAL VERIFICATION

In the graphic below each color represents a different technology, and how this technology is being utilized throughout the Lean process.

Review & Track Design Progress

Design Team Pull Plan

Model Mock Ups

Model Setup to Programming

Document Distribution
and Control

3D Site Scanning

3D Building Scanning

Value Engineering Integration

Review & Track Design Progress

Pull Plan with Design Team and Design Assist Contractors

Model Mock Ups

Weekly Coordination Meetings

Class Detection and Resolution

Document Distribution and Control

Meeting Recording

Track and Report - Continuous Improvement

Trade Pull Planning

Weekly Work Plans

MEP Coordination Meetings

Clash Detections

Prefabrications

Quality Control - BIM
vs. Installed

Document Control

Progress Reporting

Quality Control

Schedule Control

Layout and Control with BIM Model

Verification - BIM vs Installed

Multivista - Documentation

Project Team Integration with Facility Management Team

Pull Plan for Owner Furnished & Installed Equipment

As-Built Models Updates

Facility Management Software

Software Training - Facility Management Team

As-Built Record Documents

Online Final Book

Software Training - Facility Management Team

3D Surveying & Digital Verification

3D As-Built's

Multivista - As Built's